2019 SPRING Sustainable Campus Fee Project Applications
Printable List SPRING 2019
| PROJECT NAME | RESPONSIBLE PERSON | DEPT/OFFICE | FUNDING REQUEST |
---|
1 | MTSU RecycleMania | Linda Hardymon/ Sydney Smith | CEE/FSD | $1,000 |
2 | KOM First Floor Student Bottled Water Refill Station | Marva S. Lucas | University Studies | $2,700 |
3 | Recycling Support for Special Events – Football Tailgating, etc. | Linda Hardymon/ Sydney Smith | CEE/FSD | $3,500 |
4 | Support for MTSU Recycling Program – New & Replacement Bin | Linda Hardymon/ Sydney Smith | CEE/FSD | $3,500 |
5 | Campus Rec Water Bottle Filling Stations | Micah Reiss | Campus Recreation | $3,600 |
6 | Pressure Differential Sensors for Monohan | Jeff McConnell | Systems Engineering/FSD | $4,000 |
7 | LED Lighting Retrofit for Mechatronics Lab 128 in DSB | John Rozell | Engineering Technology | $4,300 |
8 | Water Refilling Stations (2) – BAS and New Science Building | Linda Hardymon/ SEA | CEE/SEA | $4,600 |
9 | Water Fountains at Murphy Center Classroom Hallways on 1st Floor – 2 | Boniface Amuzu | Murphy Center Complex | $4,800 |
10 | BigBelly Solar Compactor | Linda Hardymon/ SEA | CEE/SEA | $6,000 |
11 | Tree Planting Project | Jason W. Young | Grounds Services | $6,000 |
12 | Closed Loop Air and Sediment (Miller Education Center) | Donnell Thompson | Energy Services | $8,000 |
13 | Hydration Stations (4) in the Fairview Building | Kara Hooper | Creative and Visual Services, Fairview 130 | $8,000 |
14 | Insulate Pipes (COGN, LIB, MGB, STU, VET, CAB, various piping in campus mechanical rooms) | Leslie Mayberry | Energy Services | $8,100 |
15 | Flowmeter BTUmeter for Monohan | Jeff McConnell | Systems Engineering/FSD | $9,000 |
16 | Flowmeter BTUmeter for AMG | Jeff McConnell | Systems Engineering/FSD | $9,000 |
17 | Flowmeter BTUmeter for Murphy Center | Jeff McConnell | Systems Engineering/FSD | $9,000 |
18 | AFMS for OA damper at BAS | Jeff McConnell | Systems Engineering/FSD | $10,000 |
19 | Siemens Controls for Variable Air Volume Boxes – Walker Library (26 boxes) | Norman Buck | Energy Services | $10,560 |
20 | Variable Speed Drive Motor Additions Rec Center Phase 2 | Ray Wiley | Campus Recreation | $15,997 |
21 | Retrofitted LEDs for Outdoor Lamps Across Campus: Old Main Circle and Walnut Grove | Forrest Higginbotham/ Linda Hardymon | Building Services | $19,706 |
22 | Retrofitted LEDs for Outdoor Lamps Across Campus: Rutherford Lot | Forrest Higginbotham/ Linda Hardymon | Building Services | $19,706 |
23 | Retrofitted LEDs for Outdoor Lamps Across Campus: Scarlett Commons | Forrest Higginbotham/ Linda Hardymon | Building Services | $19,706 |
24 | AFMS for OA (Outside Air) damper and SA (Supply Air) at REC | Jeff McConnell | Systems Engineering/FSD | $22,000 |
25 | Solar-Powered Attic Fans for Scarlett Commons | Sebastiano Spada | Construction Services | $28,182.60 |
26 | Energy Efficiency Lighting (Child Development Center) Fairview | Connie Casha | Early Learning Programs/College of Ed | $37,145.50 |
| | | Total | $ 278,103.10 |